Phone:
扫一扫添加官方微信
Available on water, gas, oil pipelines, etc.
Constructions
Insert the rehabilitation hose with three layers with cover to prevent abrasion while inserting, textile inside to reinforce and liner to prevent corrasion, into the host pipeline by winching machine, and two couplings at two ends to renew the whole host pipe.
Pros
No-dig except the two manholes no matter on earth or beneath the sea
Max. single length per liner is 5 KM/ 3.11 Miles
Bends friendly
At least 50-year service life
Much less time consumption than replacing new pipes
Traffic and environment friendly
Especially suitable for pipelines with rivers, railways, runways at Airport, existing buildings and even interchanges/main streets in the city.
Procedure


Room 402-1, Building B, Phase I, Haitai Green Industry Base, No. 6 Haitai Development 6th Road, Huayuan Industrial Zone, Binhai High-Tech Zone, Tianjin

After-sales Service:022-58387760
Room 402-1, Building B, Phase I, Haitai Green Industry Base, No. 6 Haitai Development 6th Road, Huayuan Industrial Zone, Binhai High-Tech Zone, Tianjin
After-sales Service:18902036337
market@enstline.com
© 2026 Tianjin Energy Solution Technology CO., LTD. All Rights Reserved. Powered By TengYun



